Lancashire cheesemaker Dewlay's is making the switch to wind power by installing a 126-metre wind turbine on its site near Preston.

Once it is fully operational, the turbine is expected to meet all of the dairy's energy requirements and will reduce its carbon emissions by 2,992 tonnes a year. There will be a 40-day test period before the turbine is fully commissioned.